Thursday, July 14, 2011

Ben Tre Bridge Building

After making his way across the current unreliable bridge, this child leaps to land barely missing a fall of about 10 feet.
Students help workers move wood through a narrow opening in barbed wire that will be used as scaffolding during the construction of the bridge.
The new bridge will provide safe passage to a nearby school that these children attend.

After work, PVNF Summer Volunteers pose for a group picture at the site of the new bridge that is dedicated to a former member.

No comments:

Post a Comment